Material Takeoff
Delivery Time:
Adds a day to the project
What’s included in the Material Takeoff package?
Manual JDS Material Takeoff: Includes a Material list you can take to a supplier to quote the job.
Radiant Design Material Takeoff: This includes a near-boiler piping diagram with takeoff and material list required to go from the boiler to the loop manifolds.
What information is needed to start?
A Material list can be ordered only in combination with Manual JDS or Radiant design or if we’ve already performed one of those in the past. I can’t trust that a Manual JDS/Radiant design performed by someone else is properly designed, and I refuse to deliver a low-quality product.
Where can I use the Material Takeoff?
You can take the material list to a supplier to provide a quote for the job.
What software do you use?
I use the ACCA-certified Wrightsoft program to design the house. Instead of trusting plugins with a large margin of error, I do every Material list by hand.
Are you familiar with the most up-to-date mechanical codes?
Yes, I am a Master HVAC Contractor License holder for the state of New Jersey and must have code update classes to maintain my license. I have completed well over 5000 load calculations for various states.